All MetalShaping

Go Back   All MetalShaping > General Metal Shaping Discussion > Shop Safety
  Today's Posts Posts for Last 7 Days Posts for Last 14 Days  

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 07-14-2019, 09:49 AM
Bart Bart is offline
Member
 
Join Date: Jun 2011
Location: Sydney, Austraila
Posts: 290
Default

Sounds like a good option right now.

Quote:
Originally Posted by cvairwerks View Post
Might be worth seeing if you can rent a telehandler type 4x4 forklift to make the move. When I did steel building construction, we were able to pull a 150 ton crawler crane out of the mud with one and not sink ourselves.

With the telehandler type unit, you can move the load very low to the ground by extending the boom, set it down and creep the unit up to the load and then repeat if need be, rather than just powering thru.
Attached Images
File Type: jpg JCB_531-70_Telehandler_(15761521233)[1].jpg (82.4 KB, 36 views)
__________________
Bart Risuccia
Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT -5. The time now is 03:12 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.