All MetalShaping

Go Back   All MetalShaping > General Metal Shaping Discussion > Buck Building
  Today's Posts Posts for Last 7 Days Posts for Last 14 Days  

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #9  
Old 02-27-2019, 03:10 PM
heinke's Avatar
heinke heinke is offline
MetalShaper of the Month Jan 2018
 
Join Date: Nov 2009
Location: Prescott, AZ
Posts: 487
Thumbs up

Quote:
Originally Posted by 68rustang View Post
Joel,

I just found this thread after somebody mentioned it in your C5GTO thread. How do you have the time for all these awesome projects?

I have a 5' x 8' capacity CNC router and would be willing to help you in any way possible if needed. I realize Cleveland Ohio is quite a ways from CA but just wanted to make the offer.
Eric: I've already committed the job of cutting the buck stations to a local CNC cutting business. I'm still trying to figure out a cost effective way to get the hammer form sections shaped/cut though. Please PM me your contact info if you think you might be able to help with that.
__________________
Joel Heinke
Be original; don't be afraid of being bold!
Reply With Quote
 

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT -5. The time now is 06:42 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.