All MetalShaping

Go Back   All MetalShaping > Metal Shaping Projects > Automotive Projects
  Today's Posts Posts for Last 7 Days Posts for Last 14 Days  

Reply
 
Thread Tools Search this Thread Display Modes
  #301  
Old 02-16-2017, 02:59 PM
Raidmagic Raidmagic is offline
Member
 
Join Date: Feb 2017
Location: Brandon, Fl.
Posts: 3
Default

What a great thread. This is the first I've seen of this thread and it is absolutely AMAZING!! Great work.
__________________
Steve
Reply With Quote
  #302  
Old 06-02-2019, 12:01 PM
invision invision is offline
MetalShaper of the Month May 2014
 
Join Date: Apr 2011
Location: Niagara Falls, Ontario Canada
Posts: 643
Default

Hi Guys! With everything that has been going on over the past few years it has been a challenge to find time to work on R2 let alone keep this build thread updated. A little while ago a good friend had the thought that if he took R2 off my hands it would get done. So that's how it went.

In an effort to save time, rather than build a tube chassis he insisted we use a C5 Corvette donor chassis.

So.. once the chassis and body were married we fabricated engine and transaxle mounts behind the cab. With the powerplant installed the exhaust system could be routed and mocked up.


The body received numerous cosmetic changes including a front and rear fascia redesign, re-arching the rear quarter features and reconfiguring the door openings by moving the B Pillar rearward and lengthening the doors approximately 6".


Reinstalling the exterior sheet metal and locating all the components within the front storage and interior compartments.


Preparations being made to lift R2's LS1/G50 engine/transaxle back into place for the nth time to mock up cooling, power steering and HVAC lines.


Final metal finishing underway and addressing a few interior deails before R2 heads into bodywork and paint.


The candle is burning from both ends to get this project completed. Once the door glass tracks are set the doors will get skinned, installed and gapped. We'll be using the original skins that were made, but had to be extended by 6" due to the reconfiguration of the body.



Thanks for looking.
__________________
Nick M.

A journey in design and fabrication begins with a vision, a single pen stroke ... and in some cases the blow of a hammer.

Some projects: http://www.facebook.com/iNVisionPrototypes
Reply With Quote
  #303  
Old 06-11-2019, 04:26 AM
Antoine_P Antoine_P is offline
Member
 
Join Date: Feb 2019
Location: Stuttgart, Germany
Posts: 73
Default

Amazing progress, starting to look really really good!!

Antoine
__________________
Antoine Puygranier
Resurrecting a 60 ghia:
http://www.allmetalshaping.com/showthread.php?t=18852
Reply With Quote
  #304  
Old 06-26-2019, 06:57 AM
invision invision is offline
MetalShaper of the Month May 2014
 
Join Date: Apr 2011
Location: Niagara Falls, Ontario Canada
Posts: 643
Default

Thank you for checking out our build.

Here's the most recent photo update. We're into blocking the body after shooting it with a few coats of high build 2k primer.
__________________
Nick M.

A journey in design and fabrication begins with a vision, a single pen stroke ... and in some cases the blow of a hammer.

Some projects: http://www.facebook.com/iNVisionPrototypes
Reply With Quote
  #305  
Old 06-26-2019, 07:19 AM
toreadorxlt toreadorxlt is offline
MetalShaper of the Month August '15 Jan '17 Dec'17 Aug'19
 
Join Date: Aug 2011
Location: NH
Posts: 567
Default

keep em coming. looking great!
__________________
Steve
Reply With Quote
  #306  
Old 06-26-2019, 07:34 AM
Jaroslav Jaroslav is offline
Member
 
Join Date: Dec 2012
Location: Czech Republic
Posts: 733
Default

Beautiful work, you got a new impulse. When will it be completed?
__________________
Jaroslav
Reply With Quote
  #307  
Old 06-26-2019, 09:34 AM
Kerry Pinkerton's Avatar
Kerry Pinkerton Kerry Pinkerton is offline
Administrator
 
Join Date: May 2009
Location: Near Huntsville, Alabama. Just south of the Tennessee line off I65
Posts: 7,674
Default

Really impressive work Nick!
__________________
Kerry Pinkerton
Reply With Quote
  #308  
Old 06-28-2019, 06:26 AM
invision invision is offline
MetalShaper of the Month May 2014
 
Join Date: Apr 2011
Location: Niagara Falls, Ontario Canada
Posts: 643
Default

One of the original ideation sketches for R2. At the time it was based on a 'what if' concept.. as in what if we built 'the next one'.

__________________
Nick M.

A journey in design and fabrication begins with a vision, a single pen stroke ... and in some cases the blow of a hammer.

Some projects: http://www.facebook.com/iNVisionPrototypes
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump

All times are GMT -5. The time now is 07:59 PM.

Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.